|
East Pharsalia listed site Cleared 25 acres of wooded site, stripped and stockpiled topsoil, constructed access roads, installed underground utility lines, cut and filled 30,000 cubic yards of soil to develop staging/treatment area. Paved soil staging area; excavated, blended and backfilled contaminated soil areas; installed in situ bioremediation/SVE system. Restored site.
Location: East Pharsalia, NY
|
Abscope experience areas Watertight sheetpiling & vertical barriers |