|
Skaneateles, NY: Listed site
Excavated approximately 400,000 tons of contaminated soils and disposed of offsite, designed and implemented water diversion system capable of pumping 40,000 gal/min to enable creek remediation. Constructed and operated a dewatering system that worked in conjunction with site wastewater treatment system. Installated a free product interceptor trench, demolished the former manufacturing plant, over-packed drums as encountered, installed 10,000 sq. feet of sheetpile for safe excavation adjacent to creek.
Location: Skaneateles, NY |
Abscope experience areas Watertight sheetpiling & vertical barriers |