Lakeland, NY (Mastri): Listed site
Developed access roads and constructed water treatment building. Erected 50,000 sq ft temporary dome structure over impacted soil area. Excavated 17,000 cu yd of contaminated soils. Soils were screened and mixed with lime for pH control and with wood chips to provide a medium for air entrainment. Installed sheetpiling at adjacent property boundaries, constructed biocells with HDPE liners, operated and maintained groundwater treatment system and soil vapor extraction system. Backfilled and restored site.