Lakeland, NY (Mastri): Listed site

Developed access roads and constructed water treatment building. Erected 50,000 sq ft temporary dome structure over impacted soil area.

Excavated 17,000 cu yd of contaminated soils. Soils were screened and mixed with lime for pH control and with wood chips to provide a medium for air entrainment.

Installed sheetpiling at adjacent property boundaries, constructed biocells with HDPE liners, operated and maintained groundwater treatment system and soil vapor extraction system.

Backfilled and restored site.

Location: Lakeland, NY
Owner: Stauffer Management
Engineer: Fluor-Daniel GTI
Project total: $560,000

 
 

Abscope experience areas

Remedial excavation

Watertight sheetpiling & vertical barriers

Groundwater treatment systems

Soil treatment

Asbestos abatement

Tank cleaning, removal, & installation

Additional environmental services