Project: CKD Landfill Groundwater Remediation
Major Project Tasks:
- Installation of:
- deep subsurface drainage system
- 60 mil HDPE liner (80,000 sf)
-
Dosing syphon & holding tank
- Earthwork
- Construction and HDPE lining of a 900,000 gal. retention pond
- Excavation and grading of 60,000 cubic yards of saturated soils
- Installation of a pump station pit requiring intricate steel sheeting
- Maintaining of high pH site dewatering needs
- Installation of a 250,000 gal Modutank
- Importation of large scale fleet of water storage containers and dewatering equipment
- Trucking and Disposal of High pH water off site
- Other
- HASP implementation and oversight
- Work plan development
Major Project Contaminants
Significant Project Obstacles
- NYSDEC time constraints
- Adverse and inclement weather conditions as project was advanced during the winter months
- Unanticipated volumes of groundwater
Location: Greene County, NY
Owner: Cement manufacturing company
Project total: $3,100,000
|