Soil remediation of formerly utilized sites, remedial action program (FURAP)

Assisted the engineer with development of site-specific work plan.

Excavated, backfilled, and disposed of 60,000 tons of impacted soil within a 20-day window, installed 8,000 sq ft of sheeting for safe excavation.

Provided dust control, provided decontamination for all vehicles and equipment on site.

Location: Windsor, CT
Owner: Confidential
Engineer: O'Brien & Gere Engineers
Project total: $1,350,000