Holyoke, MA: Lagoon remediation
Developed a plan to excavate 2,000 cu yd of bottom ash material, annual basis, from energy generation process using fossil fuels.
Developed a plan to excavate while protecting lagoon liner. Repaired, re-graded and relined a portion of the lagoon that had previously failed.
Location: New England
Owner: Confidential
Engineer: Owner
Project total: $125,000
|