Oil City, PA

Installed waterproof sheetpile. Developed work plan to protect adjacent river.

Installed 400 linear feet of turbidity curtain to mitigate impact to river, installed 250 linear feet of Waterloo™ barrier to a depths of 25 ft. Installed specialized grout at joints to make wall impermeable.

Location: Oil City, PA
Owner: Confidential
Engineer: C3 Environmental
Project total: $145,000

 
 