|
Burlington, VT: Remediation of National Guard Facility Excavated and disposed of 30 cu yd of petroleum-impacted soil. Excavated, backfilled, and installed bioventing and product recovery system including thirteen air injection wells, twenty product recovery wells, 400 linear feet of PVC piping, thirteen well hatches and concrete aprons. Restored surface area. Location: Burlington, VT Owner: U.S. government Engineer: Stone and Webster Project total: $51,000 |
Abscope experience areas Watertight sheetpiling & vertical barriers |